§ SERVICE / FLATWORK
A floor built to carry the truck and the years under it.
01
§ 01 / THE BRIEF
Garage slabs and shop floors placed on a compacted base and power troweled to a hard, dense surface that shrugs off tires and a winter's worth of road salt.
10+Years of flatwork, Sioux Falls area
4Finished shots in this set

A freshly broom-finished garage slab with a center drain, poured at the open doors of a newly framed townhome garage
§ 02 / THE WORK
Swipe through the set. Freshly troweled floors inside framed shops and garages.




01 / 04
§ 03 / NEXT
The 2026 calendar is full. The next open estimates are for 2027.
§ MORE FLATWORK
